https://www.spiedigitallibrary.org/...ges-and-program/10.1117/12.2600951.full?SSO=1 "Buildings, cleanrooms and equipment are being constructed, mirror production is ramping up, many tests are carried out to ensure a smooth implementation." (Sept 27 2021)
https://www.spiedigitallibrary.org/...duction-in-2025/10.1117/12.2622177.full?SSO=1 (April 25, 2002) Target availability in 2023 for OPC development etc.
https://wccftech.com/intel-updates-...-rapids-sierra-forest-2023-20a-18a-taped-out/ "On Intel 20A and 18A, the first nodes to benefit from RibbonFET and PowerVia our first internal test chips, and those of a major potential foundry customer have taped out with silicon running in the fab." (Intel Q3 2022 earnings call)
https://www.spiedigitallibrary.org/...duction-in-2025/10.1117/12.2622177.full?SSO=1 (April 25, 2002) Target availability in 2023 for OPC development etc.
https://wccftech.com/intel-updates-...-rapids-sierra-forest-2023-20a-18a-taped-out/ "On Intel 20A and 18A, the first nodes to benefit from RibbonFET and PowerVia our first internal test chips, and those of a major potential foundry customer have taped out with silicon running in the fab." (Intel Q3 2022 earnings call)
Last edited: