A Fast Checking Methodology for Power/Ground Shorts

A Fast Checking Methodology for Power/Ground Shorts
by Tom Dillinger on 12-01-2020 at 10:00 am

Figure 4

The most vexing problem for physical implementation engineers is debugging errors due to power-ground “shorts”, as reported by the layout-versus-schematic (LVS) physical verification flow.  The number of polygons associated with each individual grid is large – an erroneous connection between grids results in a huge number… Read More