I know this is a very imperfect question, but I’m curious from an ‘order of magnitude’ perspective, what’s the minimum amount of money involved in getting chips fabbed at TSMC these days? (Does TSMC have a hard minimum order size in terms of $$?)
i.e. Their oldest or lowest cost process*, let’s estimate a run of 10,000 chips at a ‘normal-ish’ die size (100mm2?). Let’s also assume that your chip designer(s) are free, and that you’re using industry standard tools to create cell libraries/transistor layout/etc.
Is $10M USD in the ballpark? $20M? $5M?
*Is Wikipedia correct that TSMC Fab 2 still makes 800nm transistors, on 6” / 150mm wafers?
i.e. Their oldest or lowest cost process*, let’s estimate a run of 10,000 chips at a ‘normal-ish’ die size (100mm2?). Let’s also assume that your chip designer(s) are free, and that you’re using industry standard tools to create cell libraries/transistor layout/etc.
Is $10M USD in the ballpark? $20M? $5M?
*Is Wikipedia correct that TSMC Fab 2 still makes 800nm transistors, on 6” / 150mm wafers?