TSMC Arizona Fab construction progress

How many EUV systems will this fab need? That will be the bottleneck.
The initial monthly output was projected only at 20,000 wafers and set to start manufacturing in 2024. I think TSMC and its suppliers give themselves enough time to achieve a feasible target.
 
Could this actually be 2 phases? 2 fab buildings was mentioned in the video.
20K is undoubtedly just a start, dipping your feet in the water capa level, not the limit.
Appears to be US-style fab, long in the horizontal, shorter in the vertical.
They are moving fast.
 