Intel’s Unfulfilled Expansion Plans in a Nutshell

Daniel Nenni

Admin
Staff member

Intels-Global-Footprint-624x350.png


Grappling with a series of operational challenges, Intel has been weighing options to stem losses, with cost reduction being one of its major focus. Under this scenario, the decisions the semiconductor giant has made include slashing 15% of its workforce and the cancellation of its 20A process, which can help avoiding the significant capital expenditures needed to scale the node to full production.

In addition to the aforementioned moves, rumors have been circulating regarding the progress of Intel’s global expansion, hinting that the projects at Germany and Penang might be put on hold. Moreover, though granted with USD 8.5 billion in grants and USD 11 billion in loans under the Chips and Science Act, the company has not yet received any money from the U.S. authority, raising concerns on the feasibility of its ongoing Arizona and Ohio projects.

Here is a roundup of Intel’s major expansion projects which have been reportedly delayed, scaling down, or put on hold recently, as cost considerations may be the primary reason.

Intel-Arizona-Gelsinger-1.jpg

Accompanied by construction crews on Oct. 12, 2023, Intel CEO Pat Gelsinger toured the company’s two new fabrication plants being built in Chandler, Arizona. (Credit: Intel)


US: Ohio Delayed for 2 Years, with Mass Production Expected in 2027-28

Intel plans to invest USD 100 billion over the next five years in new fabs and expansions across Arizona, New Mexico, Ohio, and Oregon, creating 10,000 manufacturing jobs and 20,000 construction jobs.

However, according to a previous report by The Register, the construction of Intel’s two fabs in Arizona has progressed more slowly than anticipated. Rising costs for materials and labor, combined with a surge in investments in the state, have resulted in a shortage of workers.

Citing Nikkei, the report notes that the cost of constructing a plant in Arizona is now four to five times higher than in other regions, such as Asia, and several times more than the initial budget Intel had anticipated.

The semiconductor giant’s Fab 52 and Fab 62 in Arizona are previously scheduled to be completed in 2024. However, The Register notes that the schedule may be delayed a bit, as the fabs are likely to begin operations later this year or in early 2025, targeting to manufacture chips using Intel’s next-generation Angstrom-era process technology, including the 18A node.

The 20 billion project in Ohio, on the other hand, may be facing larger obstacles as Intel has delayed the plan due to market downturns and delays in U.S. subsidies.

With an initial plan to begin chip manufacturing in Ohio in 2025, the company has now postponed the pipeline, aiming to complete the two fabs in 2026–2027, with operations expected to commence around 2027–2028.

EMEA: Hard-hit Area as Investments on Hold in Israel, France and Italy

The situation is not too optimistic in Europe, neither. According to a report from global media outlet Volksstimme, the construction of Intel’s Fab 29.1 and Fab 29.2 near Magdeburg, Germany, which may totaling 30 billion euros, has been postponed due to pending approval of EU subsidies and the need to remove and reuse black soil. The date of commencement has been pushed from summer 2024 to May 2025.

It is reported that Intel’s fabs in Germany were originally scheduled to start operations by late 2027 and were expected to employ advanced manufacturing processes, potentially Intel 14A (1.4nm) and Intel 10A (1nm) nodes. However, Intel now estimates that it will take four to five years to build these plants, and production is expected to commence between 2029 and 2030.

In addition, earlier in June, the struggling semiconductor giant also put a halt to the expansion of a major factory project in Israel, which was set to invest an additional USD 15 billion in a new chip plant, according to The Times of Israel.

In December, Intel had announced plans to increase its investment in the chip manufacturing plant in Kiryat Gat, from USD 10 billion to USD 25 billion, in order to secure a USD 3.2 billion grant from the Israeli government. However, it has now suspended the plan, suggesting that “managing large-scale projects, especially in our industry, often involves adapting to changing timelines,” the report states.

It is also worth noting that Intel tends to scale down on its production in the EMEA area, as in June, the company announced the sale of a 49% stake in its plant in Leixlip, Ireland, to Apollo Global Management for USD 11 billion, securing more external funding for usage.

Another report by POLITICO in July also notes that the U.S. semiconductor giant has discreetly suspended several investment plans in Europe after incurring significant losses, dealing a setback to Europe’s push to produce more microchips.

In 2022, Intel announced an initial investment of over €33 billion for R&D and Manufacturing in EU, targeting countries including France, Germany, Ireland, Italy, Poland and Spain. However, the report suggests that the promised investments for France and Italy, valued at billions of euros and potentially creating thousands of jobs, will be put on hold for now.

Asia: New Packaging Project in Malaysia Suspended

The latest of Intel’s moves on halting its global expansion would probably be the cancellation of its new chip packaging and testing project in Penang as part of cost-cutting efforts, while the operations of existing facilities will remain unaffected.

The U.S. chip giant had announced three years ago that it would invest approximately USD 7 billion to build new chip packaging and testing facilities in Malaysia, looking to make the site its largest overseas packaging and testing base. Per a report by Malaysia media outlet The Star, Intel employs around 14,000 people in Malaysia, meaning over 2,000 local employees may face the risk of job loss.

Would the series of emergency measures taken by the struggling giant stem the bleeding? Or would these moves more like a cornered beast fighting out of its way? The only thing for sure now may be that Intel would have a pretty different look after the upcoming board meeting in mid-September.

 