You are currently viewing SemiWiki as a guest which gives you limited access to the site. To view blog comments and experience other SemiWiki features you must be a registered member. Registration is fast, simple, and absolutely free so please, join our community today!
Intel is creating back up plans and parallel plans for 18A products and maybe beyond. This will give them the flexibility needed to navigate the restructuring.
I would use 18 Months from Tapeout to Launch minimum.... even that might be a paper launch (products not on shelves).
We will see the product roadmap change before Nova lake gets launched.
there will be product ROADMAP changes when intel publishes the client and datacenter/AI roadmap in the next year. This will include which skus are on which node and which are dropped.
Speaking of which.... naming convention:
If Intel takes a CPU, keeps the core, redoes it.... isnt that just a refresh? not a new generation? RLR was called 14th gen ... as was meteor lake. doesnt seem right.
and doesnt the codename "Arrow lake" go with the core design. Meteor lake on Intel 3 is not arrow lake.... the cores are different?
I hope this "when is Arrow lake not arrow lake" confusion goes away. LOL
Semiaccurate never said anything about Nova Lake. SA has a blurb called: "Intel Tapes Out a Major Product", but SA is not talking about Nova Lake or N2. This article is either mis-attributing or making things up.
Semiaccurate never said anything about Nova Lake. SA has a blurb called: "Intel Tapes Out a Major Product", but SA is not talking about Nova Lake or N2. This article is either mis-attributing or making things up.
Intel is using N2 for high performance tiles. They will also use 18A and N3. That is the bonus of using chiplets (tiles). Hopefully they will switch over the 18AP when it is ready sometime next year and have more Intel content.
Intel 18A(P) (also referred to as Intel 18A+ or simply 18A Performance) is Intel’s upcoming advanced semiconductor process node, positioned as a refinement and performance enhancement of the base Intel 18A node. It marks a critical step in Intel's roadmap to reclaim process leadership by the...
Intel is using N2 for high performance tiles. They will also use 18A and N3. That is the bonus of using chiplets (tiles). Hopefully they will switch over the 18AP when it is ready sometime next year and have more Intel content.
Intel 18A(P) (also referred to as Intel 18A+ or simply 18A Performance) is Intel’s upcoming advanced semiconductor process node, positioned as a refinement and performance enhancement of the base Intel 18A node. It marks a critical step in Intel's roadmap to reclaim process leadership by the...
I am not sure how (because people keep saying it takes 3+ years to change designs)..... but Intel is changing the nodes used on multiple chiplets to deal with financial issues. They seems to think they can shift back and forth from TSMC.
Unless they had parallel development efforts going, It would appear one can change from one node to another and tapeout in less than a year. What am I missing? thanks in advance
I am not sure how (because people keep saying it takes 3+ years to change designs)..... but Intel is changing the nodes used on multiple chiplets to deal with financial issues. They seems to think they can shift back and forth from TSMC.
Unless they had parallel development efforts going, It would appear one can change from one node to another and tapeout in less than a year. What am I missing? thanks in advance
I am not sure how (because people keep saying it takes 3+ years to change designs)..... but Intel is changing the nodes used on multiple chiplets to deal with financial issues. They seems to think they can shift back and forth from TSMC.
Unless they had parallel development efforts going, It would appear one can change from one node to another and tapeout in less than a year. What am I missing? thanks in advance
Regarding Nova Lake except for the Swappable compute tile(CPU Tile) everything is IFS the CPU Tile is dual sourced between 18AP/N2. N2 is for desktop and 18AP is mobile.
18AP and this was update given in foundry event with two products running in the fabs for 18AP(NVL/DMR)
Regarding Nova Lake except for the Swappable compute tile(CPU Tile) everything is IFS the CPU Tile is dual sourced between 18AP/N2. N2 is for desktop and 18AP is mobile.