When we move to the 1.8 Tb/s era, we cannot solve the Reality Gap with yesterday's methodologies.
Success will belong to the teams that can provide the most Admissible Evidence. And that required moving from a model of late-stage verification to upstream governance. As visualized in this pyramid, we must use Advanced Packaging as the foundational Control Plane for advanced systems. Within that controlled environment, we must build EM Corridors as our robust physical interconnects. And we must govern the convergence of that complex system using the strict, data-driven SEGA™ Framework.
My final recommendation to the industry is simple: Stop designing traces. Start architecting corridors. The next era of advanced packaging will be won by governed convergence, not by activity alone. Thank you."
Success will belong to the teams that can provide the most Admissible Evidence. And that required moving from a model of late-stage verification to upstream governance. As visualized in this pyramid, we must use Advanced Packaging as the foundational Control Plane for advanced systems. Within that controlled environment, we must build EM Corridors as our robust physical interconnects. And we must govern the convergence of that complex system using the strict, data-driven SEGA™ Framework.
My final recommendation to the industry is simple: Stop designing traces. Start architecting corridors. The next era of advanced packaging will be won by governed convergence, not by activity alone. Thank you."
