A Complete Timing Constraints Solution – Creation to Signoff

A Complete Timing Constraints Solution – Creation to Signoff
by Pawan Fangaria on 09-28-2014 at 10:00 pm

With the unprecedented increase in semiconductor design size and complexity design teams are required to accommodate multiple design constraints such as multiple power domains for low power design, multiple modes of operation, many clocks running, and third party IPs with different SDCs. As a result timing closure has become… Read More