A Migration Feasibility Study Can Turn an Uncertain Re-Design into a Measurable Engineering Project

A Migration Feasibility Study Can Turn an Uncertain Re-Design into a Measurable Engineering Project
by Mike Gianfagna on 10-14-2026 at 6:00 am

A Migration Feasibility Study Can Turn an Uncertain Re Design into a Measurable Engineering Project

Moving semiconductor IP to a new process technology is often treated as a redesign problem. For analog and mixed-signal designs, however, starting again from the schematic can overlook an asset: the engineering knowledge embedded in the existing physical layout.

Device sizing, matching, symmetry, routing, shielding, placement,… Read More